Commercial
Building Pre-Plan Info and photos required:
- List of sides of the property (A, B, C, D), beginning with “A” where the front entrance is located.
- Photos of all sides of property, labeled (A, B, C, D)
- Hydrant location
- FDC/PIC if have one
- All exits on the outside of building
- Gas Shutoff
- Water meter shutoff
- Electric shutoff
- Building layout if possible
- Photo of when you first walk in the property and include the type of material on the ceiling
- Breaker box location
- Attic access
- Any other hazards to be noted by photo and location to make access